Signs your pool is ready
- Rough plaster that scrapes feet, or bare spots showing gunite.
- A white calcium line on the tile that no amount of scrubbing removes.
- Coping that is cracked, lifting, or the wrong color for the house now.
- Cool deck that has worn through, or a deck that is too hot to cross in July.
- A pump that runs loud all day, or a heater that quit two winters ago.
What a remodel can include
| Scope | What we do |
|---|---|
| Resurfacing | Chip out or bond-coat the old finish, then apply pebble, quartz or plaster. Startup chemistry included. |
| Waterline tile | Remove and replace with glass, porcelain or stone. Calcium-resistant grout. |
| Coping | Travertine, precast concrete, or flagstone. Mastic joint redone so the deck can move without cracking the beam. |
| Decking | Acrylic overlay, travertine pavers, or a full tear-out and re-pour. |
| Equipment | Variable-speed pump, cartridge or DE filter, salt system, heater, automation. |
| Add-ons | LED lighting, a new Baja shelf, water features, a spa cut in, or a raised bond beam. |
How long it takes
A resurface with new tile is usually two to three weeks from drain to swim. Add decking and equipment and plan on four to six. We schedule around your calendar and we do not drain the pool until the crew and materials are lined up, because an empty pool in Tucson sun is not something you want sitting for weeks.
How it works
- Estimate. We walk the yard, check access, grade and setbacks, and talk through what you want. Free, and usually under an hour.
- 3D design. You see the pool, deck, spa and features together in 3D before anything is dug. Shape, finish, lighting, all of it.
- Fixed quote. A line-item quote. Excavation, shell, plumbing, equipment, finish, coping, deck and barrier each priced on their own line.
- Build. A licensed Arizona pool builder takes it from here, pulls the permit with the City or County, and builds to the approved design.
- Walkthrough. Once it passes final inspection you walk the finished pool with your builder, get the warranties, and learn how to run the equipment.
Also worth a look
- Pool Construction – New in-ground pools designed in 3D, permitted through Pima County or the City, and built to a fixed line-item price.
- Gunite & Shotcrete Pools – Custom shapes, tanning ledges, Baja shelves and spas. Steel-reinforced shells engineered for Sonoran Desert soil.
- Pool Decks, Travertine & Cool Deck – Travertine, pavers and cool-touch acrylic decks that drain right, stay walkable in July, and do not crack in the monsoon.
